Replacement of Deep-Anode Ground Bed Sites for Big Hill Cavern 104 and Site Unit 1 “A”, and BC Cavern 18 CX(s) Applied: B1.3 Date: 10/01/2013 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Supersonic Post-Combustion Inertial Carbon Dioxide Extraction System CX(s) Applied: A9 Date: 10/01/2013 Location(s): New York Offices(s): National Energy Technology Laboratory
Supersonic Post-Combustion Inertial Carbon Dioxide Extraction System CX(s) Applied: B3.6 Date: 10/01/2013 Location(s): New York Offices(s): National Energy Technology Laboratory
Subcontractor Repair of Roof Leaks at 704-3N CX(s) Applied: B1.3 Date: 09/30/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Radiological Evidence Examination Facility (REEF) Evidence Examinations CX(s) Applied: B3.6 Date: 09/30/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Lab C-131 Loading and Unloading of Vessels CX(s) Applied: B3.6 Date: 09/30/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Cast Stone Testing in the Engineering Development Lab CX(s) Applied: B3.6 Date: 09/30/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
High Performance Liquid Chromatography (HPLC) Analyses CX(s) Applied: B3.6 Date: 09/30/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Time-lapse Joint Inversion of Geophysical Data and its Application to Geothermal Prospecting CX(s) Applied: A9, B3.1 Date: 09/30/2013 Location(s): Colorado Offices(s): Golden Field Office
Idaho Petroleum Reduction Leadership Project CX(s) Applied: A1 Date: 09/30/2013 Location(s): Idaho Offices(s): National Energy Technology Laboratory