Integration of Advanced NETL-RUA Cooling Concepts into Airfoils Tested in PSU Rig CX(s) Applied: A9 Date: 06/23/2014 Location(s): Connecticut Offices(s): National Energy Technology Laboratory
B14 Renovation CX(s) Applied: B1.4, B1.15, B2.1 Date: 06/23/2014 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Preparing of Environmental Samples for Analysis CX(s) Applied: B3.6Date: 41810 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Replacement Air Dryer for the HB-Line Breathing Air System CX(s) Applied: B1.3Date: 41810 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Humboldt Mountain Communication Facility - Asbestos and Lead-based Paint Testing CX(s) Applied: B3.1 Date: 06/19/2014 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Alcoa Digital Upgrade in Oregon and Washington CX(s) Applied: B4.7 Date: 06/19/2014 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration
Tacoma Communication Site Engine Generator Replacement CX(s) Applied: B1.3 Date: 06/19/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Northwest National Marine Renewable Energy Center CX(s) Applied: B5.25 Date: 06/19/2014 Location(s): Oregon, Washington, Washington Offices(s): Golden Field Office
Establish 0.1 mg/L Cu as a target value for the ETP H Retention Basin (HRB) influent per a deviation to the ETP Waste Acceptance Criteria (WAC). CX(s) Applied: B3.1Date: 41809 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Installation of Solar Photovoltaic Systems CX(s) Applied: A9, B5.16 Date: 06/18/2014 Location(s): Wisconsin, Wisconsin Offices(s): Golden Field Office