Bi-Annual "Live Line" Maintenance Training CX(s) Applied: B1.2 Date: 10/08/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Biofuels Retail Availability Improvement Network - E85 Infrastructure Installation CX(s) Applied: B5.22 Date: 10/07/2013 Location(s): Wisconsin Offices(s): National Energy Technology Laboratory
Biofuels Retail Availability Improvement Network - E85 Infrastructure Installation CX(s) Applied: B5.22 Date: 10/07/2013 Location(s): Wisconsin Offices(s): National Energy Technology Laboratory
Site Characterization and Environmental Monitoring for the Evaluation of Beryllium to Other Naturally Occurring Metals On and Near the Hanford Site CX(s) Applied: B3.1 Date: 10/03/2013 Location(s): Washington Offices(s): River Protection-Richland Oper...
Supersonic Post-Combustion Inertial Carbon Dioxide Extraction System CX(s) Applied: B3.6 Date: 10/02/2013 Location(s): Ohio Offices(s): National Energy Technology Laboratory
Randall's Island Wind and Tidal Technology System CX(s) Applied: B5.16 Date: 12/02/2013 Location(s): New York Offices(s): Golden Field Office
Security Upgrades at Multiple Substations CX(s) Applied: ? Date: 10/02/2013 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration
Analytical Physics - Wavelength Dispersive X-Ray Fluorescence Spectroscopy CX(s) Applied: B3.6 Date: 10/01/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Biofuels Retail Availability Improvement Network - E85 Infrastructure Installation CX(s) Applied: B5.22 Date: 10/01/2013 Location(s): Wisconsin Offices(s): National Energy Technology Laboratory
Biofuels Retail Availability Improvement Network - E85 Infrastructure Installation CX(s) Applied: B5.22 Date: 10/01/2013 Location(s): Wisconsin Offices(s): National Energy Technology Laboratory