773-A, E114 Roof Replacement CX(s) Applied: B1.3 Date: 10/10/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 705-A CX(s) Applied: B1.3 Date: 10/10/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 730-A CX(s) Applied: B1.3 Date: 10/10/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Routine Operating and Administrative Activities CX(s) Applied: A8, A9, A11, B1.3, B1.23, B1.31 Date: 10/10/2013 Location(s): Missouri Offices(s): Kansas City Site Office
Gore Pass-Hayden 138 Kilovolt Transmission Line Emergency Repairs of Downed Conductor Grand County, Colorado CX(s) Applied: B1.3 Date: 10/09/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Golden Field Office Relocation to NREL Research Support Facility CX(s) Applied: B1.31 Date: 10/09/2013 Location(s): Colorado Offices(s): Golden Field Office
Biofuels Retail Availability Improvement Network - Biodiesel Infrastructure Installation CX(s) Applied: B1.15, B1.23, B5.22 Date: 10/08/2013 Location(s): Wisconsin Offices(s): National Energy Technology Laboratory
Heat Integration with Solid Sorbent Based Carbon Dioxide Capture CX(s) Applied: A9 Date: 10/08/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Advanced High Energy Li-Ion Cell for PHEV and EV Applications CX(s) Applied: B3.6 Date: 10/08/2013 Location(s): California Offices(s): National Energy Technology Laboratory
Advanced High Energy Li-Ion Cell for PHEV and EV Applications CX(s) Applied: B3.6 Date: 10/08/2013 Location(s): CX: none Offices(s): National Energy Technology Laboratory