Nepese Marsh Upgrades CX(s) Applied: B2.5 Date: 10/17/2013 Location(s): Illinois Offices(s): Fermi Site Office
Construction and Maintenance Activities at Existing Field Offices and Operation Centers CX(s) Applied: B1.3, B1.4, B1.11, B1.16, B1.17, B1.27, B1.31, B1.33, B1.34, B2.2, B2.3, B2.5, B4.7, B5.1, B5.16, B5.17, B5.23 Date: 10/17/2013 Location(s): CX: non...
Transforming Photovoltaic Installations Toward Dispatchable, Schedulable Energy Solutions CX(s) Applied: B3.6, B5.15 Date: 10/17/2013 Location(s): Oregon Offices(s): Golden Field Office
Curecanti-Morrow Point 230 Kilovolt Transmission Line Danger Tree Management, Montrose County, Colorado CX(s) Applied: B1.3 Date: 10/17/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Renovate/Modernize Lab C162, 773-A CX(s) Applied: B1.3 Date: 10/17/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 704-49S CX(s) Applied: B1.3 Date: 10/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
234-H Stack Collection Unit CX(s) Applied: B2.2 Date: 10/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
108-1K Basement Sump Pump Replacement CX(s) Applied: B1.3 Date: 10/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Geotechnical Investigation at the Sanford Lab in Lead, South Dakota CX(s) Applied: B3.1 Date: 10/15/2013 Location(s): South Dakota Offices(s): Fermi Site Office
Usk-Boundary No. 1 Transmission Line Impairment Remediation CX(s) Applied: B1.3 Date: 10/15/2013 Location(s): Washington Offices(s): Bonneville Power Administration