Infrastructure Improvement of the Kansas State University Reactor CX(s) Applied: B2.2 Date: 10/21/2013 Location(s): Idaho Offices(s): Idaho Operations Office
Development of New Analytical Capabilities for the Characterization and Measurement of Solid Actinide-Containing Materials Supporting Fuel Cycle Research and Development at Clemson University CX(s) Applied: B3.6 Date: 10/21/2013 Location(s): Idaho Off...
Subcontractor Repair of Roof Leaks at 217-3H (Metal Roof). CX(s) Applied: B1.3 Date: 10/21/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Thermal-Chemical Decomposition of Graphite CX(s) Applied: B3.6 Date: 10/17/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Infrastructure Upgrade to the Massachusetts Institute of Technology Research Reactor in Support of Operational Safety CX(s) Applied: B2.5 Date: 10/17/2013 Location(s): Idaho Offices(s): Idaho Operations Office
Supersonic Post-Combustion Inertial Carbon Dioxide Extraction System CX(s) Applied: A9 Date: 10/17/2013 Location(s): New York, Michigan Offices(s): National Energy Technology Laboratory
773-A E Wing A-Block Cell Window Replacements CX(s) Applied: B2.1 Date: 10/17/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Caustic Simulant Filterability Testing CX(s) Applied: B3.6 Date: 10/17/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Material Dynamics and Kinetics Lab CX(s) Applied: B3.6 Date: 10/17/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Preparing of Environmental Samples for Analysis CX(s) Applied: B3.6 Date: 10/17/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office