Subcontractor Repair of Roof Leaks at 763-52N CX(s) Applied: B1.3 Date: 10/30/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Installation of New A-Area Fire Water Pumphouse CX(s) Applied: B1.15 Date: 10/30/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Investigation of “Smart Parts” with Embedded Sensors for Energy System Applications CX(s) Applied: B3.6 Date: 10/30/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Oracle Substation - Breaker Support Work CX(s) Applied: B1.3 Date: 10/30/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Innovative Coating of Nanostructured Vanadium Carbide on the F/M Cladding Tube Inner Surface for Mitigating the Fuel Cladding Chemical Interactions CX(s) Applied: B3.6 Date: 10/29/2013 Location(s): Idaho Offices(s): Idaho Operations Office
D-Area Ash Basins Closure (488-1D, 488-2D, 488-4D, 489-D) CX(s) Applied: B6.1 Date: 10/29/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Bil3 Gamma-Ray Spectrometers for Reliable Room-Temperature Nuclear Materials Safeguarding CX(s) Applied: B3.6 Date: 10/29/2013 Location(s): Idaho Offices(s): Idaho Operations Office
772-F Fire Suppression Enhancements CX(s) Applied: B2.2 Date: 10/29/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Changes to K Area Interim Surveillance Process Material Handling CX(s) Applied: B6.8 Date: 10/29/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Renovation of 105-L Women's Restroom CX(s) Applied: B1.3 Date: 10/29/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office