Test Reactor Area (TRA)-1608 Water Fountain Replacement CX(s) Applied: B1.15, B1.24Date: 11/20/2015 Location(s): IdahoOffices(s): Nuclear Energy
Office of NEPA Policy and Compliance
November 20, 2015Test Reactor Area (TRA)-1608 Water Fountain Replacement
CX(s) Applied: B1.15, B1.24
Date: 11/20/2015
Location(s): Idaho
Offices(s): Nuclear Energy
In 2014, CH2M-WG Idaho, LLC (CWI) erected a temporary tension fabric structure at INTEC on the south side of building Chemical Processing Plant (CPP)-666. The structure was used by CWI as a temporary containment to facilitate replacement of the CPP-666 IX Column Resin (Davis Bacon Case Record No. Idaho Cleanup Project [ICP]-14-26). The Radiological Control organization from CWI has surveyed the tent and free released the equipment inside. The structure is no longer necessary for CWI and needs to be demolished or transferred to another entity.
CX(s) Applied: B1.15, B1.24
Date: 11/20/2015
Location(s): Idaho
Offices(s): Nuclear Energy
In 2014, CH2M-WG Idaho, LLC (CWI) erected a temporary tension fabric structure at INTEC on the south side of building Chemical Processing Plant (CPP)-666. The structure was used by CWI as a temporary containment to facilitate replacement of the CPP-666 IX Column Resin (Davis Bacon Case Record No. Idaho Cleanup Project [ICP]-14-26). The Radiological Control organization from CWI has surveyed the tent and free released the equipment inside. The structure is no longer necessary for CWI and needs to be demolished or transferred to another entity.