Remove Failed Waste Transfer Drain Line 1533 CX(s) Applied: B1.3 Date: 11/05/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Fiber Upgrades at Bonneville Power Administration (BPA) Teton Wireless Communication Site CX(s) Applied: B4.7 Date: 11/05/2013 Location(s): Wyoming Offices(s): Bonneville Power Administration
Targhee Substation Land Acquisition CX(s) Applied: B1.24 Date: 11/05/2013 Location(s): Idaho Offices(s): Bonneville Power Administration
Subcontractor Repair of Roof Leaks at 703-47A. CX(s) Applied: B1.3 Date: 11/05/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Renovate Radiochemistry Lab B138 CX(s) Applied: B1.3 Date: 11/05/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Modify Savannah River National Laboratory (SRNL) Building 773-A Laboratory C135/139 CX(s) Applied: B1.3 Date: 11/05/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Nuclear Non-destructive Assay CX(s) Applied: B3.6 Date: 11/05/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Borohydride Research and Development for Hydrogen Storage - Lab 151 CX(s) Applied: B3.6 Date: 11/05/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Fundamental Corrosion Studies in High-Temperature Molten Salt Systems for N CX(s) Applied: B3.6 Date: 11/05/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Texas Alternative Fuel Vehicle Pilot Program CX(s) Applied: A1, B5.22 Date: 11/04/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory