Subcontractor Repair of Roof Leaks at 248-H CX(s) Applied: B1.3 Date: 11/12/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Savannah River National Laboratory (SRNL) Building 735-13A Heating, Ventilation and Air-Conditioning (HVAC) System Addition CX(s) Applied: B1.3 Date: 11/12/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Pilot-Scale Evaluation of an Advanced Carbon Sorbent-Based Process for Post-Combustion Carbon Capture CX(s) Applied: A9 Date: 11/12/2013 Location(s): California Offices(s): National Energy Technology Laboratory
Pilot-Scale Evaluation of an Advanced Carbon Sorbent-Based Process for Post-Combustion Carbon Capture CX(s) Applied: B3.6 Date: 11/12/2013 Location(s): Connecticut Offices(s): National Energy Technology Laboratory
Pilot-Scale Evaluation of an Advanced Carbon Sorbent-Based Process for Post-Combustion Carbon Capture CX(s) Applied: A9 Date: 11/12/2013 Location(s): California Offices(s): National Energy Technology Laboratory
Grays River Confluence Property Funding CX(s) Applied: B1.25 Date: 11/08/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Spectroscopy System for Teaching and Research CX(s) Applied: B1.31 Date: 11/08/2013 Location(s): Washington Offices(s): Idaho Operations Office
Research and Teaching Equipment for Nuclear Materials Characterization CX(s) Applied: B1.31 Date: 11/08/2013 Location(s): California Offices(s): Idaho Operations Office
Protection and Communication Facilities Maintenance CX(s) Applied: B1.3, B1.7, B1.19 Date: 11/08/2013 Location(s): Arizona, Nevada, California, Utah Offices(s): Western Area Power Administration-Desert Southwest Region
Subcontractor Repair of Roof Leaks at 704-L CX(s) Applied: B1.3 Date: 11/07/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office