Pilot-Scale Silicone Process for Low-Cost Carbon Dioxide (CO2) Capture CX(s) Applied: B3.6 Date: 11/13/2013 Location(s): Alabama Offices(s): National Energy Technology Laboratory
Model Validation Using Computational Fluid Dynamics (CFD)-Grade Experimental Database for Next Generation Nuclear Plant (NGNP) Reactor Cavity Cooling Systems with Water and Air CX(s) Applied: B3.6 Date: 11/13/2013 Location(s): Michigan Offices(s): Ida...
Long-term In-situ Monitoring for Subsurface Contaminant Stability CX(s) Applied: B3.6 Date: 11/13/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
High Fidelity Ion Beam Simulation of High Dose Neutron Irradiation CX(s) Applied: B1.31, B3.6 Date: 11/13/2013 Location(s): Michigan Offices(s): Idaho Operations Office
Off-gas Treatment: Evaluation of Nano-structured Sorbents for Selective Removal of Contaminants CX(s) Applied: B3.6 Date: 11/13/2013 Location(s): Idaho Offices(s): Idaho Operations Office
High Performance NiMH Alloy For Next-Generation Batteries CX(s) Applied: B3.6Date: 11/13/2013 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Bench-Scale Development and Testing of a Novel Adsorption Process for Post Combustion Carbon Dioxide (CO2) Capture CX(s) Applied: B3.6 Date: 11/13/2013 Location(s): Delaware Offices(s): National Energy Technology Laboratory
Measurements and Modeling to Quantify Emissions of Methane and Volatile Organic Compounds (VOCs) from Shale Gas Operations CX(s) Applied: B3.1 Date: 11/13/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Insulator Replacement on North Bonneville-Midway No. 1 Transmission Line (update to previous CX issued 7/16/13) CX(s) Applied: B4.6 Date: 11/12/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Subcontractor Repair of Roof Leaks at 724-36E CX(s) Applied: B1.3 Date: 11/12/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office