701-13G Wackenhut Services, Inc. (WSI) Repair of the Septic Tank Drain Field at Barricade 6 CX(s) Applied: B1.3 Date: 11/21/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Gore Pass-Kremmling 138-kilovolt Transmission Line Danger Tree Management CX(s) Applied: B1.3 Date: 11/21/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Safeguards in Pyroprocessing: an Integrated Model Development and Measurement Data Analysis CX(s) Applied: B3.6 Date: 11/20/2013 Location(s): Ohio Offices(s): Idaho Operations Office
Advancement of the Kinetic Hydropower System to Department of Energy Technology Readiness Level 7/8 CX(s) Applied: B3.6 Date: 11/20/2013 Location(s): New York, Connecticut, New York, Colorado Offices(s): Golden Field Office
245-16F Restroom: Major Repairs CX(s) Applied: B1.3 Date: 11/20/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Wyandotte Integrated Renewable Energy Strategy 2 CX(s) Applied: A9 Date: 11/20/2013 Location(s): Michigan Offices(s): Golden Field Office
Technetium Removal Laboratory Directed Research & Development (LDRD) Research with an Alkaline Simulant CX(s) Applied: B3.6 Date: 11/20/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Phinix, LLC - Production of Primary Quality Magnesium and Al-Mg Alloys from Secondary Aluminum Scraps CX(s) Applied: B3.6 Date: 11/20/2013 Location(s): Kentucky, Arizona Offices(s): Advanced Research Projects Agency-Energy
Analytical Physics - X-Ray Diffraction Operation (Project Extension) CX(s) Applied: B3.6 Date: 11/19/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Multiphase Nanocrystalline Ceramic Concept for Nuclear Fuel CX(s) Applied: B3.15 Date: 11/19/2013 Location(s): California Offices(s): Idaho Operations Office