Windy Gap-Granby Pumping Plant and Granby Pumping Plant-Mary's Lake (West Portal) 69-kilovolt Transmission Line Danger Tree Management CX(s) Applied: B1.3 Date: 11/21/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mount...
Muddy Pass-Walden 69-kilovolt Transmission Line Danger Tree Management CX(s) Applied: B1.3 Date: 11/21/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Notice of Proposed Rulemaking for Energy Conservation Standards for General Service Fluorescent Lamps and Incandescent Reflector Lamps CX(s) Applied: B5.1 Date: 11/21/2013 Location(s): Nationwide Offices(s): Golden Field Office
Kremmling-Windy Gap 138-kilovolt Transmission Line Danger Tree Management CX(s) Applied: B1.3 Date: 11/21/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Hayden Communications Site Tower Removal and Parking Area Grading (Amended) CX(s) Applied: B1.3, B1.19 Date: 11/21/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
701-13G Wackenhut Services, Inc. (WSI) Repair of the Septic Tank Drain Field at Barricade 6 CX(s) Applied: B1.3 Date: 11/21/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Gore Pass-Kremmling 138-kilovolt Transmission Line Danger Tree Management CX(s) Applied: B1.3 Date: 11/21/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Safeguards in Pyroprocessing: an Integrated Model Development and Measurement Data Analysis CX(s) Applied: B3.6 Date: 11/20/2013 Location(s): Ohio Offices(s): Idaho Operations Office
Advancement of the Kinetic Hydropower System to Department of Energy Technology Readiness Level 7/8 CX(s) Applied: B3.6 Date: 11/20/2013 Location(s): New York, Connecticut, New York, Colorado Offices(s): Golden Field Office
245-16F Restroom: Major Repairs CX(s) Applied: B1.3 Date: 11/20/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office