Test Area North (TAN)-601 Fiber Optic Cable Installation CX(s) Applied: B1.31Date: 12/07/2015 Location(s): IdahoOffices(s): Nuclear Energy
Office of NEPA Policy and Compliance
December 7, 2015Test Area North (TAN)-601 Fiber Optic Cable Installation
CX(s) Applied: B1.31
Date: 12/07/2015
Location(s): Idaho
Offices(s): Nuclear Energy
The proposed action would install and test a Cincinnati Sub-Zero (CSZ) Model ZPH-8-2-H/AC Temperature/Humidity Test Chamber at the IF-675 Majestic Park PINS Laboratory (MPPL) located at 2752 E. 14th N. Idaho Falls, Idaho. The chamber unit is approximately 3 ft. X 5 ft. X 6 ft. high.
CX(s) Applied: B1.31
Date: 12/07/2015
Location(s): Idaho
Offices(s): Nuclear Energy
The proposed action would install and test a Cincinnati Sub-Zero (CSZ) Model ZPH-8-2-H/AC Temperature/Humidity Test Chamber at the IF-675 Majestic Park PINS Laboratory (MPPL) located at 2752 E. 14th N. Idaho Falls, Idaho. The chamber unit is approximately 3 ft. X 5 ft. X 6 ft. high.