Warm Syngas Cleanup Operational Testing at Tampa Electric Company’s Polk 1 IGCC CX(s) Applied: B3.6Date: 11/09/2015 Location(s): North CarolinaOffices(s): National Energy Technology Laboratory

Office of NEPA Policy and Compliance

November 9, 2015
Estimated Read Time   min
Warm Syngas Cleanup Operational Testing at Tampa Electric Company’s Polk 1 IGCC
CX(s) Applied: B3.6
Date: 11/09/2015
Location(s): North Carolina
Offices(s): National Energy Technology Laboratory

Operation of warm syngas desulfurization process in an existing pilot plant using a slip-stream of syngas from TEC IGCC Polk Power Plant, with lab support at RTI in Research Triangle Park, NC.