Additive Manufacturing of Smart Parts with Embedded Sensors for In-Situ Monitoring in Advanced Energy CX(s) Applied: B3.6 Date: 09/26/2013 Location(s): Ohio Offices(s): National Energy Technology Laboratory
Subcontractor Repair of Roof Leaks at 717-1N CX(s) Applied: B1.3 Date: 09/26/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Driscoll-Naselle #1 Tower Relocation CX(s) Applied: B1.3 Date: 09/26/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Additive Manufacturing of Smart Parts with Embedded Sensors for In-Situ Monitoring in Advanced Energy CX(s) Applied: B3.6 Date: 09/26/2013 Location(s): South Carolina Offices(s): National Energy Technology Laboratory
North Shore Wildlife Management Area Property Funding CX(s) Applied: B1.25 Date: 09/26/2013 Location(s): Montana Offices(s): Bonneville Power Administration
Additive Manufacturing of Smart Parts with Embedded Sensors for In-Situ Monitoring in Advanced Energy CX(s) Applied: B3.6 Date: 09/26/2013 Location(s): Missouri Offices(s): National Energy Technology Laboratory
Fate of Methane Emitted from Dissociating Marine Hydrates: Modeling, Laboratory, and Field Constraints CX(s) Applied: A1, A9, B3.6 Date: 09/25/2013 Location(s): Massachusetts Offices(s): National Energy Technology Laboratory
Fate of Methane Emitted from Dissociating Marine Hydrates: Modeling, Laboratory, and Field Constraints CX(s) Applied: A1, A9, B3.6 Date: 09/25/2013 Location(s): Massachusetts Offices(s): National Energy Technology Laboratory
Environmental Restoration and Waste Management Activities for Pantex Plant for FY 2014 CX(s) Applied: B6.1, B6.2 Date: 09/25/2013 Location(s): Texas Offices(s): Pantex Site Office
B-922 Sprinkler System Replacement CX(s) Applied: B1.15, B2.2, B2.5 Date: 09/25/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory