Deactivation and Decommissioning of 711-L CX(s) Applied: B1.23Date: 41793 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Vacuum System Testing for 235-F Risk Reduction Project CX(s) Applied: B3.6Date: 41793 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Building Water Removal from 216-C To Sanitary Sewer Lift Station CX(s) Applied: B1.28Date: 41793 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Replace Antifreeze in Sprinkler System F-wing Loading Dock CX(s) Applied: B1.3Date: 41793 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Amargosa Substation (Conduit and Storage Pad Installation) CX(s) Applied: B1.3 Date: 06/03/2014 Location(s): Nevada Offices(s): Western Area Power Administration-Desert Southwest Region
Hyper Scratcher Tool: A Patented Oil, Gas, Disposal, & Injection Well Tool for Enhancing Production CX(s) Applied: A9 Date: 06/03/2014 Location(s): Utah Offices(s): National Energy Technology Laboratory
Support Buildings CX(s) Applied: B1.15 Date: 06/03/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Relocation of Buildings CX(s) Applied: B1.22 Date: 06/03/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Facility Safety and Environmental Improvements CX(s) Applied: B2.6 Date: 06/03/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Water Treatment System for Effective Acid Mine Drainage Water Use in Hydraulic Fracturing CX(s) Applied: B3.6 Date: 06/03/2014 Location(s): Indiana, Texas, Ohio, Pennsylvania, Georgia Offices(s): National Energy Technology Laboratory