Swan Valley-Teton Overhead Fiber Line Install CX(s) Applied: B4.6 Date: 06/02/2014 Location(s): Idaho Offices(s): Bonneville Power Administration
Crossman Peak Communication Site Lease and Equipment Upgrades at 5 Facilities CX(s) Applied: B1.19 Date: 06/02/2014 Location(s): Arizona, Arizona, Arizona, California, Nevada Offices(s): Western Area Power Administration-Desert Southwest Region
Hood River-Coop Service #1 Access Road Maintenance CX(s) Applied: B1.3 Date: 06/02/2014 Location(s): Oregon Offices(s): Bonneville Power Administration
Cowlitz Tap Rebuild and Access Road Maintenance CX(s) Applied: B1.3, B1.24, B4.13 Date: 06/02/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Danger Tree Management on Gore Pass-Hayden 138-kilovolt Transmission Line, Grand and Routt Counties, Colorado CX(s) Applied: B1.3 Date: 06/02/2014 Location(s): Colorado, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Danger Tree Management on Craig-Rifle 230-kilovolt Transmission Line, Moffat, Rio Blanco, and Garfield Counties, Colorado CX(s) Applied: B1.3 Date: 06/02/2014 Location(s): Colorado, Colorado, Colorado Offices(s): Western Area Power Administration-Rock...
Danger Tree Management on Blue River-Gore Pass 230-kilovolt Transmission Line (Amended), Grand County, Colorado CX(s) Applied: B1.3 Date: 06/02/2014 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Carib Energy (USA) LLC CX(s) Applied: B5.7Date: 05/30//2014 Location(s): FloridaOffices(s): Office of Oil and Natural Gas
Analysis of Best Practices for Deepwater Cementing in Oil-Based Mud and Synthetic-Based Mud CX(s) Applied: A9, A11, B3.6 Date: 05/30/2014 Location(s): New Jersey Offices(s): National Energy Technology Laboratory
Demolition and Removal (D&R) of FTF Change Shack 242-12F CX(s) Applied: B1.23 Date: 05/30/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office