Building 130 CX(s) Applied: B1.23, B1.3 Date: 05/28/2014 Location(s): New York Offices(s): Brookhaven Site Office
Accelerator Test Facility II CX(s) Applied: B3.10 Date: 05/28/2014 Location(s): New York Offices(s): Brookhaven Site Office
Asarco and Troy Substations Grounding Mat Installations CX(s) Applied: B4.6 Date: 05/27/2014 Location(s): Montana Offices(s): Bonneville Power Administration
H-Area Closed-Circuit Television Camera Security Enhancement CX(s) Applied: B2.2 Date: 05/27/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Zonal Isolation Improvements for Horizontal Wells Drilled in the Marcellus Shale CX(s) Applied: A9 Date: 05/27/2014 Location(s): Texas Offices(s): National Energy Technology Laboratory
Methodology & Algorithm Development for Evaluation of UDW or Arctic Floating Platform Performance CX(s) Applied: A9 Date: 05/27/2014 Location(s): Texas Offices(s): National Energy Technology Laboratory
Methodology & Algorithm Development for Evaluation of UDW or Arctic Floating Platform Performance CX(s) Applied: A9 Date: 05/27/2014 Location(s): Texas Offices(s): National Energy Technology Laboratory
Distributed Fiber Optic Arrays: Integrated Temperature and Seismic Sensing for Detection of Carbon Dioxide Flow.. CX(s) Applied: B3.11 Date: 05/27/2014 Location(s): Alabama Offices(s): National Energy Technology Laboratory
Development of Advanced CFD Tools for Enhanced Prediction of Explosion Pressure Development and … CX(s) Applied: A9, A11, B3.6, B3.11 Date: 05/27/2014 Location(s): California Offices(s): National Energy Technology Laboratory
Development of Advanced CFD Tools for Enhanced Prediction of Explosion Pressure Development and ... CX(s) Applied: A9, A11 Date: 05/27/2014 Location(s): Maryland Offices(s): National Energy Technology Laboratory