High Energy Lithium Batteries for Plug-in Hybrid Electric Vehicle (PHEV) Applications CX(s) Applied: B3.6 Date: 09/13/2013 Location(s): Michigan Offices(s): National Energy Technology Laboratory
High Energy Lithium Batteries for Plug-in Hybrid Electric Vehicle (PHEV) Applications CX(s) Applied: B3.6 Date: 09/13/2013 Location(s): California Offices(s): National Energy Technology Laboratory
Hebo Substation Access Road Maintenance CX(s) Applied: B1.3 Date: 09/13/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Chehalis-Raymond Number 1 Access Road Maintenance CX(s) Applied: B1.3 Date: 09/13/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
Infrastructure Modification for the Mobile Plutonium Facility (MPF) at the 645-N Complex CX(s) Applied: B1.15 Date: 09/13/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Fabrication and Testing of a Hydrogen Generation Rate Apparatus CX(s) Applied: B3.6 Date: 09/13/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Improve Fuel Economy through Formulation Design and Modeling CX(s) Applied: B3.6, B3.11, B5.1 Date: 09/13/2013 Location(s): Ohio Offices(s): National Energy Technology Laboratory
High Performance DC-Bus Capacitors CX(s) Applied: B3.6, B5.15 Date: 09/13/2013 Location(s): New York, Indiana Offices(s): National Energy Technology Laboratory
Advanced Climate Control and Cabin Preconditioning using Zonal Distribution, Advanced Heat Pump CX(s) Applied: B3.6 Date: 09/13/2013 Location(s): Michigan Offices(s): National Energy Technology Laboratory
Characterizing the Response of the Cascadia Margin Gas Hydrate Reservoir to Climate Change CX(s) Applied: B3.6 Date: 09/13/2013 Location(s): Washington Offices(s): National Energy Technology Laboratory