Fiscal Year (FY)-14 Wireless Test Bed Fiber Optic Cable to Gate 1 and Experimental Breeder Reactor-I (EBR-I) Cell Sites CX(s) Applied: B4.7Date: 41855 Location(s): IdahoOffices(s): Nuclear Energy
Chehalis-Covington #1 Access Roads CX(s) Applied: B1.13Date: 41865 Location(s): WashingtonOffices(s): Bonneville Power Administration
Snohomish-Beverly Park #3 and #4 Line Structure Replacements CX(s) Applied: B1.3Date: 41865 Location(s): WashingtonOffices(s): Bonneville Power Administration
Mossy Rock-Chehalis #1 Access Road Maintenance CX(s) Applied: B1.3Date: 41865 Location(s): WashingtonOffices(s): Bonneville Power Administration
Lexington-Longview #1 Access Road Maintenance CX(s) Applied: B1.3Date: 41865 Location(s): WashingtonOffices(s): Bonneville Power Administration
LIDAR Buoy Acceptance and Capability Testing
Advanced Models for Nondestructive Evaluation of Aging Nuclear Power Plant Cables – Iowa State University CX(s) Applied: B3.6Date: 41864 Location(s): IowaOffices(s): Nuclear Energy
Periodic Material–Based Seismic Base Isolators for Small Modular Reactors-University of Houston CX(s) Applied: B3.6Date: 41864 Location(s): TexasOffices(s): Nuclear Energy
Sorption Modeling and Verification for Off-Gas Treatment-Syracuse University CX(s) Applied: B3.6Date: 41864 Location(s): New YorkOffices(s): Nuclear Energy
Nanostructured Bulk Thermoelectric Generator for Efficient Power Harvesting for Self-powered Sensor Networks – Boise State University CX(s) Applied: B3.15Date: 41864 Location(s): IdahoOffices(s): Nuclear Energy