Characterizing the Response of the Cascadia Margin Gas Hydrate Reservoir to Climate Change CX(s) Applied: B3.1, B3.11, B3.16 Date: 09/13/2013 Location(s): Washington Offices(s): National Energy Technology Laboratory
Characterizing the Response of the Cascadia Margin Gas Hydrate Reservoir to Climate Change CX(s) Applied: A9 Date: 09/13/2013 Location(s): Washington Offices(s): National Energy Technology Laboratory
H2-Dependent Conversion of Carbon Dioxide to Liquid Electrofuels by Extremely Thermophilic Archaea CX(s) Applied: B3.6Date: 09/12/2013 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Diversity in Science and Technology Advances National Clean Energy in Solar CX(s) Applied: A9, B3.6 Date: 09/12/2013 Location(s): Texas Offices(s): Golden Field Office
Shelton-Fairmont Number 2 115-Kilovolt Tap CX(s) Applied: B4.11 Date: 09/12/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Alvey-Lane #1 Transmission Line Access Road Maintenance CX(s) Applied: B1.3 Date: 09/12/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Improved Large Aperture Collector Manufacturing CX(s) Applied: A9, B3.6, B5.17 Date: 09/12/2013 Location(s): Colorado Offices(s): Golden Field Office
Repair Domestic Water Leak at SFP Facilities CX(s) Applied: B1.3 Date: 09/12/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Bridgeport-Gering 115-Kilovolt Transmission Line Structure Replacement CX(s) Applied: B1.3 Date: 09/12/2013 Location(s): Nebraska, Nebraska Offices(s): Western Area Power Administration-Rocky Mountain Region
Easement to Tennessee Valley Authority for Bethel Valley Substation and Transmission Line Feeds and Clearing of Trees within the Project Area at the Oak Ridge National Laboratory CX(s) Applied: B1.24, B4.11, B4.12 Date: 09/12/2013 Location(s): Tenness...