High Hydrogen, Low Methane Syngas from Low Ranked Coals for Coal-to-Liquids Production CX(s) Applied: B3.6 Date: 09/10/2013 Location(s): North Carolina Offices(s): National Energy Technology Laboratory
Blast and Paint West Hackberry Meter Skid, Prover Piping and Structure CX(s) Applied: B1.3 Date: 09/09/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Piezometer Installation at 488-1D and 488-2D CX(s) Applied: B3.1 Date: 09/09/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 707-7F CX(s) Applied: B1.3 Date: 09/09/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Receipt, Unloading, and Movement of Radioactive Samples in Support of the 3013 Pu Surveillance Program CX(s) Applied: B3.6 Date: 09/09/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 776-6A CX(s) Applied: B1.3 Date: 09/09/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 735-A CX(s) Applied: B1.3 Date: 09/09/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 773-43A CX(s) Applied: B1.3 Date: 09/09/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Modular Caustic Side Solvent Extraction (MCU) Improved Solvent Testing CX(s) Applied: B3.6 Date: 09/09/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
High Energy High Power Battery Exceeding PHEV40 Requirements CX(s) Applied: B3.6 Date: 09/06/2013 Location(s): Massachusetts Offices(s): National Energy Technology Laboratory