Installation of Manway to H-Canyon Exhaust Tunnel CX(s) Applied: B2.5 Date: 09/19/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Install Nitrogen Analyzer in 772-F, Lab 175, Glovebox #1 CX(s) Applied: B3.6 Date: 09/19/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Install One (1) Universal Wiring Drop on West End Wall in the 704-L Cafeteria CX(s) Applied: B1.3 Date: 09/19/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Install Blinds in 704-L Cafeteria CX(s) Applied: B1.3 Date: 09/19/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 773-A, B-Wing CX(s) Applied: B1.3 Date: 09/19/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
HTRL Isotope Separation and General R&D CX(s) Applied: B3.6 Date: 09/19/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Port Angeles-Sappho #1 Shelton-Kitsap #4 Access Roads CX(s) Applied: B1.3 Date: 09/19/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
Active, Tailorable Adhesives for Dissimilar Material Bonding, Repair and Reassembly CX(s) Applied: B3.6 Date: 09/18/2013 Location(s): Michigan Offices(s): National Energy Technology Laboratory
An Extensible Sensing and Control Platform for Building Energy Management CX(s) Applied: A9, B3.6 Date: 09/18/2013 Location(s): Pennsylvania Offices(s): Golden Field Office
Active, Tailorable Adhesives for Dissimilar Material Bonding, Repair and Reassembly CX(s) Applied: B3.6 Date: 09/18/2013 Location(s): Michigan Offices(s): National Energy Technology Laboratory