CHPRC Installation or Relocation of Machinery and Equipment CX(s) Applied: B1.31Date: 10/14/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
Office of NEPA Policy and Compliance
October 14, 2015CHPRC Installation or Relocation of Machinery and Equipment
CX(s) Applied: B1.31
Date: 10/14/2015
Location(s): Washington
Offices(s): River Protection-Richland Operations Office
This annual CX allows subcontractors to perform installation or relocation and operation of machinery and equipment.