Hanford High Level Waste Melter Riser Crystal Settling Test CX(s) Applied: B3.6Date: 10/05/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
October 5, 2015Hanford High Level Waste Melter Riser Crystal Settling Test
CX(s) Applied: B3.6
Date: 10/05/2015
Location(s): South Carolina
Offices(s): Savannah River Operations Office
A full-scale version of the Hanford Waste Treatment and Immobilization Plant (WTP) melter riser constructed with transparent material will be assembled and tested in 786-A to provide data in support of model development for the Hanford melter. The system will also provide a platform to demonstrate mitigation or recovery strategies in off-normal events where crystal accumulation impedes melter operation.
CX(s) Applied: B3.6
Date: 10/05/2015
Location(s): South Carolina
Offices(s): Savannah River Operations Office
A full-scale version of the Hanford Waste Treatment and Immobilization Plant (WTP) melter riser constructed with transparent material will be assembled and tested in 786-A to provide data in support of model development for the Hanford melter. The system will also provide a platform to demonstrate mitigation or recovery strategies in off-normal events where crystal accumulation impedes melter operation.