Yakima Training Center Wind Resource Assessment CX(s) Applied: A9, B3.1 Date: 04/23/2014 Location(s): Washington Offices(s): Golden Field Office
Burial of Overhead Fiber Optic Cable at Grand Coulee Radio Station CX(s) Applied: B4.7 Date: 04/21/2014 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
Cowlitz Falls Fish Facility and Fish Transfer Facility Property Transfers CX(s) Applied: B1.24 Date: 04/21/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Capability Enhancement at the 325 Hazardous Waste Treatment Units CX(s) Applied: B6.6 Date: 04/16/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Tacoma-Raver Access Road Easement Exchange CX(s) Applied: B1.24 Date: 04/14/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Line Tap Construction on the East Ellensburg Tap to Columbia-Ellensburg Transmission Line CX(s) Applied: B4.6 Date: 04/11/2014 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
Chehalis-Mayfield Number 1 Line Impairment Structure Replacements CX(s) Applied: B1.3 Date: 04/03/2014 Location(s): Washington Offices(s): Bonneville Power Administration
B3S4-White Bluffs Number 1 and Benton-B3S4 Number 1 Transmission Line Reroute CX(s) Applied: B4.13 Date: 04/02/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Cowlitz Falls Fish Facility Access Agreement Extension CX(s) Applied: A2 Date: 04/02/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Port Townsend Paper Corporation Power Sales Agreement Amendment CX(s) Applied: B4.1 Date: 04/01/2014 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration