PNNL Projects Involving Small-Scale Research and Development, Laboratory Operations, and Pilot Projects in the 300 Area CX(s) Applied: B3.6 Date: 07/03/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office
PNNL Projects Involving Routine Maintenance in the 300 Area CX(s) Applied: B1.3 Date: 07/03/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Achieving Hydrogen Storage Goals through High-Strength Fiber Glass CX(s) Applied: A9, B3.6 Date: 07/02/2014 Location(s): North Carolina, Pennsylvania, Nebraska, Washington Offices(s): Golden Field Office
PNNL Involving Siting, Modifying and Operating Support Buildings on the Hanford Site CX(s) Applied: B1.15 Date: 06/24/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office
PNNL Involving Facility, Safety, and Environmental Improvements in the 300 Area CX(s) Applied: B2.5 Date: 06/24/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Alcoa Digital Upgrade in Oregon and Washington CX(s) Applied: B4.7 Date: 06/19/2014 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration
Tacoma Communication Site Engine Generator Replacement CX(s) Applied: B1.3 Date: 06/19/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Northwest National Marine Renewable Energy Center CX(s) Applied: B5.25 Date: 06/19/2014 Location(s): Oregon, Washington, Washington Offices(s): Golden Field Office
Deer Park Substation Connection Modifications CX(s) Applied: B4.11 Date: 06/17/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Longview-Chehalis #3 Transmission Structure Footing Repair CX(s) Applied: B1.3 Date: 06/12/2014 Location(s): Washington Offices(s): Bonneville Power Administration