Bonneville Power Administration (BPA) proposes to construct a new mobile transformer storage building in the J.D. Ross Substation and Regional Oper…
Bonneville Power Administration (BPA) proposes to complete urgent maintenance on the Vantage-Hanford No. 1 transmission line. The work would includ…
Bonneville Power Administration (BPA) proposes to relocate guy wires on two wood pole structures located on the Kalispell-Kerr No. 1 high voltage t…
Bonneville Power Administration (BPA) proposes to fund Yakama Nation Fisheries (YNF) to implement geotechnical and groundwater testing and aquatic …
Bonneville Power Administration (BPA) proposes to upgrade the perimeter fence and install new electronic security systems at Monroe Substation. The…
Bonneville Power Administration (BPA) proposes to replace insulators and associated hardware and to install fall protection from structure 110/4 to…
Bonneville Power Administration (BPA) proposes to allow the property owner to remove a flagpole on BPA fee-owned property that has been identified …
The City of Ruston plans to convert approximately 3,780 linear feet of existing overhead electrical distribution infrastructure to underground cond…
The U.S. Department of Energy (DOE) Hanford Field Office (HFO) and Cereza Energy Center LLC propose to construct a photovoltaic solar and battery e…
The U.S. Department of Energy (DOE) Hanford Field Office (HFO) and Cereza Energy Center LLC propose to construct a photovoltaic solar and battery energy storage system (BESS) facility (Cereza Energy Center or Facility) on the Hanford Site using a phased approach beginning with site characterization and environmental monitoring.