Bonneville Power Administration (BPA) proposes to maintain the existing access road network between line miles 1 and 14, and between line miles 30 …
Install new and improved fault detection devices on existing facilities designed to mitigate sources of wildfire ignition. Replace existing wood po…
Bonneville Power Administration (BPA) proposes to fund the Washington Department of Fish and Wildlife (WDFW) to remove an existing push-up dam that…
BPA proposes to reconductor and replace associated hardware along the Wautoma-Rock Creek No. 1 500 kV transmission line from miles 37 to 43. Replac…
Bonneville Power Administration (BPA) proposes to allow AT and T to upgrade their antennas and related equipment at six wireless sites across Washi…
Bonneville Power Administration (BPA) proposes to allow AT and T to upgrade an existing wireless telecommunications site located on tower 7/2 of th…
18 aged transmission poles and 1.5 miles of transmission line with distribution line under will be replaced. Pole holes dug with auger or backhoe. …
Bonneville Power Administration (BPA) proposes to continue funding to the Pacific States Marine Fisheries Commission (PSMFC) to collect Chinook sal…
Proposed project activities will making several critical infrastructure upgrades in areas prone to frequent outages, including substation upgrades,…
Bonneville Power Administration (BPA) proposes to remedy eight impairments along the Boundary-Sacheen No. 1 and two impairments along the Sacheen-B…