Bonneville Power Administration (BPA) proposes to rebuild an approximately 3-mile-long segment of the White Bluffs to Richland No. 1 115-kilovolt (…
Bonneville Power Administration (BPA) proposes to allow the Pend Oreille Public Utility District (POPUD) to upgrade the existing secondary station …
Bonneville Power Administration (BPA) proposes to improve and reconstruct existing access roads, construct new access roads, and stabilize landslid…
Bonneville Power Administration (BPA) proposes to fund the Yakama Nation Klickitat Fisheries Project (YKFP) to implement a second phase of pre-proj…
Bonneville Power Administration (BPA) proposes to fund the North Yakima Conservation District (NYCD), through the Yakima Tributary Access and Habit…
BPA proposes to allow Okanogan County Electric Cooperative (the "Co-op") to trench and install a fiber optic cable at BPA's Winthrop Substation in …
Bonneville Power Administration (BPA) proposes to add interior fencing and add additional base rock within the Grand Coulee Substation 230-kilovolt…
Bonneville Power Administration (BPA) proposes to fund the Yakama Nation Fisheries (YNF) to conduct stream habitat and geomorphic reach assessments…
Bonneville Power Administration (BPA) is proposing to replace seven deteriorating wood pole structures and associated hardware at specific location…
Bonneville Power Administration (BPA) is proposing to correct an issue at structure 9/1 on the Lexington-Longview No. 1 transmission line. The stru…