Bonneville Power Administration (BPA) Proposes to allow AT and T to upgrade an existing telecommunication site located on tower 12/3 of the Tacoma …
Bonneville Power Administration (BPA) proposes to conduct access road improvements along the Olympia-Grand Coulee No. 1 transmission line from mile…
Bonneville Power Administration (BPA) proposes to allow Verizon to upgrade their antennas and related equipment at Custer Site in Whatcom County, W…
The Bonneville Power Administration (BPA) proposes to fund the Confederated Tribes and Bands of the Yakama Nation (YN) Fisheries to construct a new…
Bonneville Power Administration (BPA) is proposing to replace Lexington-Longview No. 1 structure 9/1 and any associated hardware and guys. The stru…
Bonneville Power Administration (BPA) proposes to excavate ground impairments on the Raver-Echo Lake No. 1 transmission line at two locations along…
Bonneville Power Administration (BPA) is proposing to replace about 2 miles of existing fiber optic cable between Raymond Substation and the Raymon…
Bonneville Power Administration (BPA) proposes to provide funds to the Columbia Conservation District (CCD) for restoration activities to increase …
Bonneville Power Administration (BPA) proposes to replace insulators and associated hardware and to install fall protection on steel lattice transm…
CX-034005: Washington DNR Bonneville Ross No. 1/N Bonneville-Troutdale No. 1 Access Road Use Request
BPA would allow the Washington Department of Natural Resources (DNR) to use approximately 0.8 mile of BPA's existing access road within BPA ROW on …