Murray, Snohomish, and Sno-King Substations Equipment Acquisition CX(s) Applied: B1.24 Date: 05/21/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Pacific Northwest National Laboratory Microbiological and Biomedical Research Projects in the 300 Area CX(s) Applied: B3.12 Date: 05/21/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Bell-Boundary Fiber Project (update to previous CX issued on 6/11/13) CX(s) Applied: B4.7 Date: 05/14/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Custer-Ingledow Access Road Maintenance CX(s) Applied: B1.3 Date: 05/14/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Naselle-Tarlett #1 Access Road Maintenance CX(s) Applied: B1.3 Date: 05/14/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Chehalis-Olympia #1 Access Road Maintenance CX(s) Applied: B1.3 Date: 05/14/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Pasco District Wood Pole Replacements (Multiple Lines) 2014 CX(s) Applied: B1.3 Date: 05/09/2014 Location(s): Washington, Washington, Oregon Offices(s): Bonneville Power Administration
Fiscal Year 2014 Communication Site Engine Generator Replacements CX(s) Applied: B1.3 Date: 05/05/2014 Location(s): Oregon, Oregon, Washington, Oregon Offices(s): Bonneville Power Administration
Alfalfa Substation Control House Replacement CX(s) Applied: B4.11 Date: 05/02/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Raver-Covington Conductor Replacement CX(s) Applied: B1.3 Date: 04/24/2014 Location(s): Washington Offices(s): Bonneville Power Administration