McNary-Ross Tower 137/4 Replacement CX(s) Applied: B1.3Date: 41837 Location(s): WashingtonOffices(s): Bonneville Power Administration
Equipment Installations at Multiple Substations and Radio Facilities CX(s) Applied: B1.7 Date: 07/14/2014 Location(s): Washington, Washington, Washington, Washington, Washington Offices(s): Bonneville Power Administration
300-296 Waste Site Retrieval Pilot Project CX(s) Applied: B3.6 Date: 07/09/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Radiological Survey 600 Area Supporting Land CX(s) Applied: B3.1 Date: 07/09/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Montoe-Custer Miles 38 and 55-58 Access Road Improvements CX(s) Applied: B1.3Date: 41827 Location(s): WashingtonOffices(s): Bonneville Power Administration
Sno-King Tap Miles 10-11 Access Road Improvements CX(s) Applied: B1.3Date: 41827 Location(s): WashingtonOffices(s): Bonneville Power Administration
PNNL Projects Involving Small-Scale Research and Development, Laboratory Operations, and Pilot Projects in the 300 Area CX(s) Applied: B3.6 Date: 07/03/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office
PNNL Projects Involving Routine Maintenance in the 300 Area CX(s) Applied: B1.3 Date: 07/03/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Achieving Hydrogen Storage Goals through High-Strength Fiber Glass CX(s) Applied: A9, B3.6 Date: 07/02/2014 Location(s): North Carolina, Pennsylvania, Nebraska, Washington Offices(s): Golden Field Office
PNNL Involving Siting, Modifying and Operating Support Buildings on the Hanford Site CX(s) Applied: B1.15 Date: 06/24/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office