Chief Joseph-Foster Creek Underground Fiber Optic Cable Installation (update to previous CX issued September 14, 2015) CX(s) Applied: B4.7Date: 10/26/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Vantage Substation-Control House, Fire Detection and Alarm Installs CX(s) Applied: B2.2Date: 10/21/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Communication Equipment Removals (#WC Projects) CX(s) Applied: B1.19Date: 10/21/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Midway Substation Upgrades CX(s) Applied: B4.6Date: 10/20/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
CHPRC Asbestos Removal CX(s) Applied: B1.16Date: 10/14/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
CHPRC Routine Maintenance CX(s) Applied: B1.3Date: 10/14/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
CHPRC Installation or Relocation of Machinery and Equipment CX(s) Applied: B1.31Date: 10/14/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
CHPRC Cleanup Actions CX(s) Applied: B6.1Date: 10/14/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
Ross Warehouse Asbestos and Lead Paint Abatement CX(s) Applied: B1.16Date: 09/21/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Balancing Authority Area Services Agreement with Georgia-Pacific Consumer Products (Camas) LLC CX(s) Applied: B4.1Date: 09/16/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration