Alstom Grid Commercial Microgrid Design Development. and Testing for PIDC and PWD Systems CX(s) Applied: A1, A9, A11Date: 02/02/2015 Location(s): WashingtonOffices(s): National Energy Technology Laboratory
McNary-Franklin #2 Wood Pole Replacement CX(s) Applied: B1.3Date: 01/27/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Approval of Land Use Review Request for Sewer Installation and Park Construction in a BPA Right-of-Way in Clark County CX(s) Applied: B4.9Date: 01/26/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Vera Tap to Trentwood-Valley Transmission Line Rebuild CX(s) Applied: B4.13Date: 01/16/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Sustained Low Temperature NOx Reduction Development CX(s) Applied: B3.6Date: 01/13/2015 Location(s): WashingtonOffices(s): National Energy Technology Laboratory
Replace Buckling Tower 1/9 on the Raymond-Henkle Street Number 1 Line CX(s) Applied: B4.13Date: 01/06/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Wahkiakum 115 Kilovolt Disconnect Switch Addition CX(s) Applied: B4.6Date: 12/30/2014 Location(s): WashingtonOffices(s): Bonneville Power Administration
Haystack Butte Radio Site Land Acquisition CX(s) Applied: B1.24Date: 41939 Location(s): WashingtonOffices(s): Bonneville Power Administration
15-Minute Transmission Scheduling CX(s) Applied: B4.4, B4.5Date: 41933 Location(s): WashingtonOffices(s): Bonneville Power Administration
North Bonneville Substation 23- Kilovolt Line Retermination CX(s) Applied: B4.11Date: 41926 Location(s): WashingtonOffices(s): Bonneville Power Administration