Tacoma-Raver Access Road Easement Exchange CX(s) Applied: B1.24 Date: 04/14/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Line Tap Construction on the East Ellensburg Tap to Columbia-Ellensburg Transmission Line CX(s) Applied: B4.6 Date: 04/11/2014 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
Chehalis-Mayfield Number 1 Line Impairment Structure Replacements CX(s) Applied: B1.3 Date: 04/03/2014 Location(s): Washington Offices(s): Bonneville Power Administration
B3S4-White Bluffs Number 1 and Benton-B3S4 Number 1 Transmission Line Reroute CX(s) Applied: B4.13 Date: 04/02/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Cowlitz Falls Fish Facility Access Agreement Extension CX(s) Applied: A2 Date: 04/02/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Port Townsend Paper Corporation Power Sales Agreement Amendment CX(s) Applied: B4.1 Date: 04/01/2014 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration
Telephone Line Removal Along the Access Road into Wautoma Substation CX(s) Applied: B1.3 Date: 03/17/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Fiber Installation at Snohomish, SnoKing and Murray Substations CX(s) Applied: B4.7 Date: 01/27/2014 Location(s): Washington Offices(s): Bonneville Power Administration
St. Clair Loop in to Olympia-South Tacoma No.1 230-kilovolt (kV) Transmission Line CX(s) Applied: B4.11 Date: 01/22/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Ellensburg-Moxee No. 1 Right-Of-Way (ROW) Geotechnical Exploration Between Structures 17/1-22/2 CX(s) Applied: B4.7 Date: 01/22/2014 Location(s): Washington Offices(s): Bonneville Power Administration