Pilot Proposal for Reducing the Cost of Carbon Dioxide Capture and Compression-Advanced Carbon Dioxide CX(s) Applied: B3.6Date: 09/15/2015 Location(s): WashingtonOffices(s): National Energy Technology Laboratory
Chief Joseph-Foster Creek Underground Fiber Optic Cable Installation CX(s) Applied: B4.7Date: 09/14/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Snohomish Substation Equipment Replacement and Expansion Project CX(s) Applied: B4.11Date: 09/10/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Wautoma-Ostrander No. 1 Upgrade Project CX(s) Applied: B1.3, B4.6Date: 09/02/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Benton-Franklin #1 and Benton-Franklin #2 Wood Pole Replacement CX(s) Applied: B1.3Date: 09/02/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Bagley and Comarron Wireless Communication Facilities CX(s) Applied: B1.19Date: 08/26/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Taneum Creek Property Acquisition Funding CX(s) Applied: B1.25Date: 08/26/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Kennewick Radio Station HVAC Replacement CX(s) Applied: B1.4Date: 08/24/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Little Goose-Lower Granite #1 Fiber Repair Project CX(s) Applied: B1.3Date: 08/19/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Low-Cost, Efficient, and Durable High Temperature Wireless Sensors by Direct Write Additive Manufacturing for Application in Fossil Energy Systems CX(s) Applied: B3.6Date: 08/07/2015 Location(s): WashingtonOffices(s): National Energy Technology Laboratory