Categorical Exclusion Determinations: Washington

Line Tap Construction on the East Ellensburg Tap to Columbia-Ellensburg Transmission Line CX(s) Applied: B4.6 Date: 04/11/2014 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
B3S4-White Bluffs Number 1 and Benton-B3S4 Number 1 Transmission Line Reroute CX(s) Applied: B4.13 Date: 04/02/2014 Location(s): Washington Offices(s): Bonneville Power Administration
St. Clair Loop in to Olympia-South Tacoma No.1 230-kilovolt (kV) Transmission Line CX(s) Applied: B4.11 Date: 01/22/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Ellensburg-Moxee No. 1 Right-Of-Way (ROW) Geotechnical Exploration Between Structures 17/1-22/2 CX(s) Applied: B4.7 Date: 01/22/2014 Location(s): Washington Offices(s): Bonneville Power Administration