Characterizing the Response of the Cascadia Margin Gas Hydrate Reservoir to Climate Change CX(s) Applied: B3.1, B3.11, B3.16 Date: 09/13/2013 Location(s): Washington Offices(s): National Energy Technology Laboratory
Characterizing the Response of the Cascadia Margin Gas Hydrate Reservoir to Climate Change CX(s) Applied: A9 Date: 09/13/2013 Location(s): Washington Offices(s): National Energy Technology Laboratory
Shelton-Fairmont Number 2 115-Kilovolt Tap CX(s) Applied: B4.11 Date: 09/12/2013 Location(s): Washington Offices(s): Bonneville Power Administration
A Systematic Multiscale Modeling and Experimental Approach to Protect Grain Boundaries in Magnesium… CX(s) Applied: A9 Date: 09/11/2013 Location(s): Washington Offices(s): National Energy Technology Laboratory
Line Upgrade on Bonneville Power Administration’s Walla Walla-Pendleton Number 1 Transmission Line CX(s) Applied: B1.3 Date: 08/30/2013 Location(s): Washington, Oregon Offices(s): Bonneville Power Administration
Salmon Creek Pond Property Funding CX(s) Applied: B1.25 Date: 08/29/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Salmon Creek Meadow Property Funding CX(s) Applied: B1.25 Date: 08/29/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Routine Maintenance and Custodial Services August 2013 to August 2014 CX(s) Applied: B1.3 Date: 08/28/2013 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Renewable Acid-hydrolysis Condensation Hydrotreating (REACH) Pilot Plant CX(s) Applied: A9 Date: 08/27/2013 Location(s): Washington Offices(s): Golden Field Office
Monroe-Custer #2 Access Roads CX(s) Applied: B1.3 Date: 08/26/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration