Siting, Modifying and Operating Support Buildings on the Hanford Site - 2013 CX(s) Applied: B1.15 Date: 06/13/2013 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Site Characterization and Environmental Monitoring on the Hanford Site - 2013 CX(s) Applied: B3.14 Date: 06/13/2013 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Bell-Boundary Fiber Project CX(s) Applied: B4.7 Date: 06/11/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
Electroalcoholgenesis CX(s) Applied: B3.6 Date: 06/10/2013 Location(s): South Carolina, Washington Offices(s): Advanced Research Projects Agency-Energy
Grand Coulee District Wood Replacement CX(s) Applied: B1.3 Date: 06/07/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
Underwood Tap Structure Replacement and Access Road CX(s) Applied: B4.6 Date: 06/07/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Tri-Cities Maintenance Headquarters Project CX(s) Applied: B1.15 Date: 06/03/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
Routine Maintenance on the Colville-Republic Number 1 Transmission Line CX(s) Applied: B1.3 Date: 05/30/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
Chenoweth-Goldendale Number 1 Disconnect Switch Project CX(s) Applied: B4.6 Date: 05/30/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Chandler Tap Line Reconductoring CX(s) Applied: B4.6 Date: 05/17/2013 Location(s): Washington Offices(s): Bonneville Power Administration