Hardeson Small Generator Integration CX(s) Applied: B1.7 Date: 09/25/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Longview and Tillamook Substation Communication Upgrades CX(s) Applied: B1.7 Date: 09/24/2013 Location(s): Washington, Oregon Offices(s): Bonneville Power Administration
Port Angeles-Sappho #1 Shelton-Kitsap #4 Access Roads CX(s) Applied: B1.3 Date: 09/19/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
Bell-Boundary Fiber Project CX(s) Applied: B4.7 Date: 09/13/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
Chehalis-Raymond Number 1 Access Road Maintenance CX(s) Applied: B1.3 Date: 09/13/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
Characterizing the Response of the Cascadia Margin Gas Hydrate Reservoir to Climate Change CX(s) Applied: B3.6 Date: 09/13/2013 Location(s): Washington Offices(s): National Energy Technology Laboratory
Characterizing the Response of the Cascadia Margin Gas Hydrate Reservoir to Climate Change CX(s) Applied: B3.1, B3.11, B3.16 Date: 09/13/2013 Location(s): Washington Offices(s): National Energy Technology Laboratory
Characterizing the Response of the Cascadia Margin Gas Hydrate Reservoir to Climate Change CX(s) Applied: A9 Date: 09/13/2013 Location(s): Washington Offices(s): National Energy Technology Laboratory
Shelton-Fairmont Number 2 115-Kilovolt Tap CX(s) Applied: B4.11 Date: 09/12/2013 Location(s): Washington Offices(s): Bonneville Power Administration
A Systematic Multiscale Modeling and Experimental Approach to Protect Grain Boundaries in Magnesium… CX(s) Applied: A9 Date: 09/11/2013 Location(s): Washington Offices(s): National Energy Technology Laboratory