CX-014626: Categorical Exclusion Determination

Project L-525: 24-inch Export Water Line Installation, 2901Y to 200E CX(s) Applied: B5.5Date: 12/29/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office

Office of NEPA Policy and Compliance

December 29, 2015
Estimated Read Time   min

Project L-525: 24-inch Export Water Line Installation, 2901Y to 200E
CX(s) Applied: B5.5
Date: 12/29/2015
Location(s): Washington
Offices(s): River Protection-Richland Operations Office

Engineer, design, construct and operate a 2.4 mile long 24-inch Export Water line between the 2901-Y Valve House and the 282-E Inlet Valve House in 200E Area.