White Bluffs Bank Building Renovation CX(s) Applied: B3.14 Date: 07/22/2013 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Capacity Increase on Bonneville Power Administration's (BPA) Horse Ranch Tap Line CX(s) Applied: B4.6 Date: 07/17/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Insulator Replacement on Bonneville Power Administration's (BPA) North Bonneville-Midway No. 1 Transmission Line CX(s) Applied: B4.6 Date: 07/16/2013 Location(s): Washington Offices(s): Bonneville Power Administration
2013 Spacer and Insulator Replacement Program; Third and Fourth Quarter Projects CX(s) Applied: B1.3 Date: 07/15/2013 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration
Chehalis Substation Tree Clearing CX(s) Applied: B1.3 Date: 07/02/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Nine Canyon Communication Tower Addition CX(s) Applied: B4.6 Date: 07/01/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Harbour Pointe Small Generator Integration CX(s) Applied: B1.7 Date: 06/25/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
Small-Scale Research and Development Projects Using Nanoscale Materials, 300 Area, Richland, Washington CX(s) Applied: B3.15 Date: 06/24/2013 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Facility Safety and Environmental Improvements in the 300 Area - 2013 CX(s) Applied: B2.5 Date: 06/24/2013 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Lexington-Delameter 115-kilovolt (kV) Transmission Line Sale CX(s) Applied: B1.24 Date: 06/20/2013 Location(s): Washington Offices(s): Bonneville Power Administration