Ellensburg Substation Expansion and Control House Addition CX(s) Applied: B4.11Date: 07/23/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
July 23, 2015Ellensburg Substation Expansion and Control House Addition
CX(s) Applied: B4.11
Date: 07/23/2015
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration proposes to expand the northwest corner of BPA’s existing Ellensburg Substation fenced area to provide space for a new Power Control Assembly (PCA), which would replace the existing substation control house that is inundated by frequent flooding.