Revenue Meter Replacement at Benton County Public Utility District’s (PUD) Finley Substation CX(s) Applied: B1.7 Date: 03/13/2013 Location(s): Washington Offices(s): Bonneville Power Administration
2013 Spacer and Insulator Replacement Program: First and Second Quarter Projects CX(s) Applied: B1.3 Date: 03/11/2013 Location(s): Oregon, Oregon, Washington, Montana, Montana Offices(s): Bonneville Power Administration
Coulee-Westside Transfer Trip Replacement CX(s) Applied: B1.7 Date: 02/06/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
MSA Annual Categorical Exclusion for Facilities for Storing Packaged Hazardous Waste for 90 Days or Less CX(s) Applied: B6.4 Date: 01/22/2013 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Thermoelectric Generators for Direct Conversion of Vehicle Waste Heat in Useful Electric Power CX(s) Applied: B3.6 Date: 01/16/2013 Location(s): Washington Offices(s): National Energy Technology Laboratory
Innovations in Advanced Materials and Metals (IAM2) CX(s) Applied: A9, A11 Date: 01/15/2013 Location(s): Washington Offices(s): Golden Field Office
Stabilization of Bio-Oil Fractions for Insertion into Petroleum Refineries CX(s) Applied: A9, B3.6 Date: 01/15/2013 Location(s): Iowa, Oklahoma, Washington Offices(s): Golden Field Office
Roosevelt Radio Station Emergency Generator Removal and Replacement CX(s) Applied: B1.3 Date: 01/07/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Pacific Northwest National Laboratory- Non-Wire Methods for Transmission Congestion Management Through Predictive Simulation and Optimization CX(s) Applied: B3.6 Date: 01/03/2013 Location(s): Washington, North Carolina, Illinois, Oregon Offices(s): Ad...
Continuation of Yakama Nation Sturgeon Management Project CX(s) Applied: B1.20 Date: 12/27/2012 Location(s): Washington, Washington Offices(s): Bonneville Power Administration