Categorical Exclusion Determinations: Washington

Upgrade Six Wireless Communication Sites (Clear Creek, Evergreen, Fruit Valley, KSLM, Minnehaha, Popcorn) CX(s) Applied: B1.19 Date: 11/06/2013 Location(s): Oregon, Washington, Washington Offices(s): Bonneville Power Administration
CH2MHill Plateau Remediation Company - Small-scale Research and Development, Laboratory Operations, and Pilot Projects, November 2013 to November 2014 CX(s) Applied: B3.6 Date: 11/05/2013 Location(s): Washington Offices(s): River Protection-Richland O...
"Equipment Additions to the Ostrander and Pearl Substations and Dittmer Control Center
CX(s) Applied: B1.7 Date: 11/01/2013 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration"
Siting, Construction, and Operation of New Septic Tank, Drain Field and Fencing at the 400 Area Fast Flux Test Facility CX(s) Applied: B1.15 Date: 10/28/2013 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Balancing Authority Area Services Agreement with Port Townsend Paper Corporation CX(s) Applied: B4.1 Date: 10/10/2013 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration
Site Characterization and Environmental Monitoring for the Evaluation of Beryllium to Other Naturally Occurring Metals On and Near the Hanford Site CX(s) Applied: B3.1 Date: 10/03/2013 Location(s): Washington Offices(s): River Protection-Richland Oper...