Franklin to Hatwai Fiber Project CX(s) Applied: B4.7 Date: 01/17/2014 Location(s): Washington, Washington, Washington, Idaho Offices(s): Bonneville Power Administration
Ross Communication Tower Fiber Installation CX(s) Applied: B4.7 Date: 01/15/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Longview-Cowlitz Fiber Optic Cable Upgrade CX(s) Applied: B4.7 Date: 01/06/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Revenue Meter Installation at Wind River Biomass Facility CX(s) Applied: B1.7 Date: 12/30/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Equipment and Property Transfers with Three Public Utilities in Oregon, Idaho and Washington CX(s) Applied: B1.124 Date: 12/26/2013 Location(s): Oregon, Idaho, Washington Offices(s): Bonneville Power Administration
Arzeda Corp. - Design of Metalloenzymes for Methane Activation CX(s) Applied: B3.6 Date: 12/19/2013 Location(s): Washington Offices(s): Advanced Research Projects Agency-Energy
Crooked Creek 3 and Deep River Mouth 2 Property Funding CX(s) Applied: B1.25 Date: 12/18/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Pacific Northwest National Laboratory - Catalyzed Organo-Metathetical Process for Magnesium Production from Seawater CX(s) Applied: B3.6 Date: 12/17/2013 Location(s): Washington, Arizona, Utah Offices(s): Advanced Research Projects Agency-Energy
Xeriscaping at Four Facilities CX(s) Applied: B1.3 Date: 12/11/2013 Location(s): Oregon, Oregon, Washington, Montana Offices(s): Bonneville Power Administration
Regents of the University of Michigan - Anaerobic Bioconversion of Methane to Methanol CX(s) Applied: B3.6 Date: 12/06/2013 Location(s): Michigan, Washington, Washington Offices(s): Advanced Research Projects Agency-Energy