PNNL Involving Facility, Safety, and Environmental Improvements in the 300 Area CX(s) Applied: B2.5 Date: 06/24/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Alcoa Digital Upgrade in Oregon and Washington CX(s) Applied: B4.7 Date: 06/19/2014 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration
Tacoma Communication Site Engine Generator Replacement CX(s) Applied: B1.3 Date: 06/19/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Northwest National Marine Renewable Energy Center CX(s) Applied: B5.25 Date: 06/19/2014 Location(s): Oregon, Washington, Washington Offices(s): Golden Field Office
Deer Park Substation Connection Modifications CX(s) Applied: B4.11 Date: 06/17/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Longview-Chehalis #3 Transmission Structure Footing Repair CX(s) Applied: B1.3 Date: 06/12/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Telecommunications Facilities Rehabilitation CX(s) Applied: B1.3 Date: 06/11/2014 Location(s): Washington, Oregon, Washington, Oregon, Oregon Offices(s): Bonneville Power Administration
Mica Peak Radio Station upgrade CX(s) Applied: B1.19 Date: 06/09/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Precursor-Derived Nanostructured Si-C-X Materials for MHD Electrode Applications CX(s) Applied: A9, B3.6 Date: 06/05/2014 Location(s): Washington Offices(s): National Energy Technology Laboratory
Support Buildings CX(s) Applied: B1.15 Date: 06/03/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office