Categorical Exclusion Determinations: Washington

St. Clair Loop in to Olympia-South Tacoma No.1 230-kilovolt (kV) Transmission Line CX(s) Applied: B4.11 Date: 01/22/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Ellensburg-Moxee No. 1 Right-Of-Way (ROW) Geotechnical Exploration Between Structures 17/1-22/2 CX(s) Applied: B4.7 Date: 01/22/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Equipment and Property Transfers with Three Public Utilities in Oregon, Idaho and Washington CX(s) Applied: B1.124 Date: 12/26/2013 Location(s): Oregon, Idaho, Washington Offices(s): Bonneville Power Administration
Arzeda Corp. - Design of Metalloenzymes for Methane Activation CX(s) Applied: B3.6 Date: 12/19/2013 Location(s): Washington Offices(s): Advanced Research Projects Agency-Energy