Verizon Franklin Park Wireless Installation CX(s) Applied: B1.19Date: 05/02/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
May 2, 2016Verizon Franklin Park Wireless Installation
CX(s) Applied: B1.19
Date: 05/02/2016
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to allow Verizon Wireless to install an unmanned telecommunications facility at tower 2/3 of the Ross-Alcoa transmission line.