Small-scale Renewable Energy Research and Development and Pilot Projects CX(s) Applied: B5.15Date: 07/24/2015 Location(s): WashingtonOffices(s): Pacific Northwest Site Office
Ellensburg Substation Expansion and Control House Addition CX(s) Applied: B4.11Date: 07/23/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Chehalis-Mayfield No. 1 Line Local Area Protection Scheme Project CX(s) Applied: B1.7, B2.2Date: 07/22/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Badger Canyon Substation Upgrades CX(s) Applied: B4.6Date: 07/21/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Ross-Lexington 12/2 Tower Stabilization Project CX(s) Applied: B1.3Date: 07/21/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Modified Thermoresponsive Hyperbranched Polymers for Improved Viscosity and Enhanced Lubricity of Engine Oils CX(s) Applied: A9Date: 07/16/2015 Location(s): WashingtonOffices(s): National Energy Technology Laboratory
Acquisition of Multiple Access Road Easements for the Holcomb-Naselle No. 1 Transmission Line CX(s) Applied: B1.42Date: 07/09/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Washougal Vegetative Maintenance - LURR 20150160 CX(s) Applied: B4.9Date: 07/08/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Longview Osmose 2015 Corrosion Mitigation and Repair Project CX(s) Applied: B1.3Date: 07/02/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Puget Sound Energy Fiber Connection CX(s) Applied: B1.42Date: 06/30/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration