Ellensburg Guy Wire Installation CX(s) Applied: B4.9Date: 03/06/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Hardeson Battery Generator Integration CX(s) Applied: B4.11Date: 02/25/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Trentwood Substation Communication Upgrade CX(s) Applied: B1.19Date: 02/11/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Prosser Tap to Grandview-Red Mountain #1 Wood Pole Replacement CX(s) Applied: B1.3Date: 02/11/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Columbia Generating Station Seismic Bus Connections CX(s) Applied: B2.5Date: 02/06/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Disconnect Switch Stand Grounding Upgrades - Spokane District CX(s) Applied: B4.6Date: 02/06/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Alstom Grid Commercial Microgrid Design Development and Testing for PIDC and PWD System CX(s) Applied: A1, A9, A11, B3.6, B4.4, B5.15Date: 02/04/2015 Location(s): WashingtonOffices(s): National Energy Technology Laboratory
Alstom Grid Commercial Microgrid Design Development. and Testing for PIDC and PWD Systems CX(s) Applied: A1, A9, A11Date: 02/02/2015 Location(s): WashingtonOffices(s): National Energy Technology Laboratory
Alstom Grid Commercial Microgrid Design Development. and Testing for PIDC and PWD Systems CX(s) Applied: A1, A9, A11Date: 02/02/2015 Location(s): WashingtonOffices(s): National Energy Technology Laboratory
McNary-Franklin #2 Wood Pole Replacement CX(s) Applied: B1.3Date: 01/27/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration