MSA Annual Categorical Exclusion for Asbestos Removal CX(s) Applied: B1.16Date: 12/31/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
MSA Annual Categorical Exclusion for Support Buildings CX(s) Applied: B1.15Date: 12/31/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
MSA Annual Categorical Exclusion for Air Conditioning Systems for Existing Equipment CX(s) Applied: B1.4Date: 12/31/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
MSA Annual Categorical Exclusion for Routine Maintenance and Custodial Services CX(s) Applied: B1.3Date: 12/31/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
MSA Annual Categorical Exclusion for Transfer Actions CX(s) Applied: B1.30Date: 12/31/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
MSA Annual Categorical Exclusion for Training Exercises and Simulations CX(s) Applied: B1.2Date: 12/31/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
MSA Annual Categorical Exclusion for Electronic Equipment CX(s) Applied: B1.7Date: 12/31/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
Project L-840: Export Water Line Replacement, 2901Y to 200W CX(s) Applied: B5.5Date: 12/29/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
Project L-525: 24-inch Export Water Line Installation, 2901Y to 200E CX(s) Applied: B5.5Date: 12/29/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
Radio Upgrades at Franklin, Nine Mile, and Walla Walla Substations CX(s) Applied: B1.19Date: 12/11/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration