Mossyrock-Chehalis No. 1 Impairment Rectification CX(s) Applied: B1.3Date: 09/16/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Door Improvements at Columbia Control House and NERC-CIP Upgrades CX(s) Applied: B1.3Date: 09/13/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Categorical Exclusion Determination
Categorical Exclusion Determination
Categorical Exclusion Determination
Sickler Control House Door Replacement and NERC-CIP Upgrades CX(s) Applied: B1.3Date: 08/31/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Lookout Mountain Radio Station and Access Road Upgrades CX(s) Applied: B1.19, B1.3Date: 08/30/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
State and Local Innovation and Analysis in Support of Long-Term Energy Planning CX(s) Applied: A9, A11Date: 08/26/2016 Location(s): WashingtonOffices(s): National Energy Technology Laboratory
Kennedy Tap Switch Addition CX(s) Applied: B4.11Date: 08/19/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Lyle Falls Fishway and Research Facility Maintenance CX(s) Applied: B1.3Date: 08/17/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration