Taneum Creek Property Acquisition Funding CX(s) Applied: B1.25Date: 08/26/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Kennewick Radio Station HVAC Replacement CX(s) Applied: B1.4Date: 08/24/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Little Goose-Lower Granite #1 Fiber Repair Project CX(s) Applied: B1.3Date: 08/19/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Low-Cost, Efficient, and Durable High Temperature Wireless Sensors by Direct Write Additive Manufacturing for Application in Fossil Energy Systems CX(s) Applied: B3.6Date: 08/07/2015 Location(s): WashingtonOffices(s): National Energy Technology Laboratory
Approval of Land Use Review Request for Fiber Installation in BPA right-of-way in Skamania County, Washington CX(s) Applied: B4.9Date: 08/06/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
North Bonneville-Ross Transmission Line Right-of-way Sale and Temporary Construction Permit - New Four Seasons Lane to 138th Ave. Segment CX(s) Applied: B1.24Date: 07/30/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Small-scale Renewable Energy Research and Development and Pilot Projects CX(s) Applied: B5.15Date: 07/24/2015 Location(s): WashingtonOffices(s): Pacific Northwest Site Office
Ellensburg Substation Expansion and Control House Addition CX(s) Applied: B4.11Date: 07/23/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Chehalis-Mayfield No. 1 Line Local Area Protection Scheme Project CX(s) Applied: B1.7, B2.2Date: 07/22/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Badger Canyon Substation Upgrades CX(s) Applied: B4.6Date: 07/21/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration