Improved Reliability of Solid Oxide Fuel Cell Systems – LG Fuel Cell Systems CX(s) Applied: B3.6Date: 01/21/2016 Location(s): WashingtonOffices(s): National Energy Technology Laboratory
Snohomish-Beverly Park Number 3 Transmission Line Wood Pole Replacement CX(s) Applied: B1.3Date: 42524 Location(s): WashingtonOffices(s): Bonneville Power Administration
T-Mobile Boistfort Peak Telecommunication Collocation CX(s) Applied: B1.19Date: 42524 Location(s): WashingtonOffices(s): Bonneville Power Administration
Chehalis-Olympia Number 1 Transmission Line Priority Pole Replacements CX(s) Applied: B1.3Date: 42524 Location(s): WashingtonOffices(s): Bonneville Power Administration
Naselle-Tartlett Transmission Line Hardware Replacements CX(s) Applied: B1.3Date: 42522 Location(s): WashingtonOffices(s): Bonneville Power Administration
Moxee Substation Equipment Upgrades CX(s) Applied: B4.11Date: 42521 Location(s): WashingtonOffices(s): Bonneville Power Administration
Big Eddy-Chenoweth, Chenoweth-Goldendale Transmission Line Wood Pole Replacements and Access Road Maintenance CX(s) Applied: B1.3Date: 42517 Location(s): WashingtonOffices(s): Bonneville Power Administration
Hydro Research Foundation University Research Awards Award Number: DE-EE0006506 CX(s) Applied: A9 Water Power Program Date: 05/19/2016 Location(s): WA Office(s): Golden Field Office
Fiscal Year 2016 Covington District Danger Pole Replacement Project CX(s) Applied: B1.3Date: 42516 Location(s): WashingtonOffices(s): Bonneville Power Administration
Switch Stand B-838 Counterpoise Installation CX(s) Applied: B4.6Date: 42513 Location(s): WashingtonOffices(s): Bonneville Power Administration